For design-build firms and industrial contractors

Win The Project
Before It Becomes A Bid.

Scayled finds the new plants, distribution centres and data halls coming to your territory while the owner is still choosing who to talk to. The evidence, the scope and the person deciding.

Book a call
Projects · Southeast and Midwest · Plants, distribution, cold, data
Intent2
EV powertrain manufacturer
Manufacturing plant · Southeast US
Power heavy

Plant Manager hire, location to be confirmed

180k to 250k sq ftHigh
Medical device maker
Cleanroom expansion · Carolinas

Capacity named as a constraint on the earnings call

60k to 90k sq ftMedium
Site Search2
Cold chain operator
Cold store and distribution · Atlanta metro

VP Real Estate appointed from a 3PL

250k to 320k sq ftHigh
Food and beverage producer
Production facility · Tennessee

Incentive application filed by a holding entity

140k to 200k sq ftMedium
Site Chosen2
Battery component maker
Cell component plant · Wisconsin
Power heavy

Land purchase recorded, design team not named

300k sq ftHigh
Data centre operator
Data hall, phase one · Northern Virginia
Power heavy

Utility capacity request reported

36 MWMedium
Design And Permits

Where project databases start. By here, the owner has met the firms it already knows.

Illustrative board. Company names withheld.

By the time a project reaches a bid list, someone already has the relationship. Scayled is built for the months before that.

Projects · Southeast and Midwest · Plants, distribution, cold, data
Intent2
EV powertrain manufacturer
Manufacturing plant · Southeast US

Plant Manager hire, location to be confirmed

180k to 250k sq ftHigh
Medical device maker
Cleanroom expansion · Carolinas

Capacity named as a constraint on the earnings call

60k to 90k sq ftMedium
Site Search2
Cold chain operator
Cold store and distribution · Atlanta metro

VP Real Estate appointed from a 3PL

250k to 320k sq ftHigh
Food and beverage producer
Production facility · Tennessee

Incentive application filed by a holding entity

140k to 200k sq ftMedium
Site Chosen2
Battery component maker
Cell component plant · Wisconsin

Land purchase recorded, design team not named

300k sq ftHigh
Data centre operator
Data hall, phase one · Northern Virginia

Utility capacity request reported

36 MWMedium

Every Project.
Before The RFP.

Scayled reads the company, not the permit: capital raised, plant leadership hired, expansion stated to investors, suppliers moving. Signals become one likely facility, with a stage and a confidence level.

Where The Work Is Won.

Every new facility moves through five stages. The relationships are made in the first three. The data most firms pay for starts at the fourth.

01

Intent

The company signals new capacity. No site, no consultant, no shortlist.

02

Site Search

A real estate lead is hired or a site selector appointed. The region narrows.

03

Site Chosen

Land is bought or optioned. The design and delivery team is still open.

04

Design And Permits

Filings appear. This is where project databases start.

05

Bid

The RFP is out. Everyone knows, and the spec is written.

Scayled
Project databases and bid lists
Inbox · Your projects this week
Monday 7:00
Scayled · Week 43 · Southeast and Midwest

4 new projects. 2 moved stage.

New
EV powertrain manufacturer
Plant · Southeast · Intent
New
Medical device maker
Cleanroom · Carolinas · Intent
Moved
Cold chain operator
Cold store · Atlanta · Site Search
Moved
Battery component maker
Plant · Wisconsin · Site Chosen
Open My Projects

Your Week Starts
With The Brief.

Business development lives in email, so that is where Scayled shows up. One brief on Monday, an alert when a project moves, and a record of what you saw first.

What Is On Every Project.

Enough to decide in a minute whether to pursue, and enough to make the first call a good one.

Facility
Plant, distribution centre, cold store, cleanroom, data hall.
Estimated scope
A size range and a construction value band, marked as estimates.
Power
Whether the facility is power heavy, which changes who you bring.
Stage and timing
Where the project sits, and when the next decision is likely.
Evidence
Every signal behind it, dated, with the source you can open.
Confidence
High, Medium or Watching. We say likely because it is likely.
The people
Operations, real estate, engineering and procurement on the owner side.
Your angle
The job you built that makes you the obvious first call.
Set up · Your project profile
Read from your website
Facility types
Manufacturing plantsDistributionCold storageCleanrooms
Territory
GeorgiaCarolinasTennesseeAlabama
Size
Over 100k sq ftOver $25m
Self-perform
ConcreteSteel erectionElectrical
Past projects found

23 projects, used to write your angle on every card.

Live In
Forty-Eight Hours.

No implementation project. Scayled reads your website, proposes your profile, and your first brief arrives with the pipeline already loaded.

Priced Per Territory.

One project won pays for years of it. Start with a sixty-day pilot at $5,000, credited if you continue.

Feed

Every project in your territory that matches what you build.

$2,500
a month, per territory
  • The Monday brief
  • The project board
  • Evidence, scope and stage on every project
  • Stage alerts

Pursuit

Most firms start here

The projects, and the way in.

$5,000
a month, per territory
  • Everything in Feed
  • Owner-side decision makers, verified
  • Your angle and a drafted first touch
  • Push to your CRM

Exclusive

Your territory and facility type, closed to other firms.

From $8,000
a month, per territory
  • Everything in Pursuit
  • One firm per territory and facility type
  • Quarterly track record review
  • A named analyst

Questions.

Project databases are built from permits, planning filings and bid notices, so a project appears once it is in the system. Scayled reads the company instead: capital raised for new capacity, plant leadership hired for a location not yet named, expansion stated to investors, suppliers moving. Most firms use both. One hands you the bid. The other hands you the relationship before there is one.

Every project carries a confidence level and every signal behind it, dated, with the source you can open. We write likely because that is what it is. A project that goes quiet is marked as watching rather than removed, and when it turns into an announcement you will have seen it coming.

The states or metros you build in, the facility types you want, and a size floor. A territory is set up from your own website and past projects, and you confirm it before the first brief.

The owner side: operations, real estate, engineering and procurement. When a site selector or developer has been appointed, them too. Every address is verified before it reaches you.

On Feed and Pursuit, another firm in your territory could. Exclusive closes your territory and facility type to everyone else, which is why it is priced the way it is.

Sixty days at $5,000, credited if you continue. We set up your territory, send the Monday brief and agree the success criteria up front, for example ten projects that match your profile. We never promise wins. We promise the pipeline.

Get In Before The RFP.

Tell us where you build. We will show you what is coming there.

Book a call